Thursday, September 6, 2007

Swap Quiltlet Ready to Mail

Here is the finished product! I am rather pleased with it all in all though for some reason the corners of the binding just didn't turn out quite the way I wanted them too. I have not finished the second one for myself but it shouldn't take too long. I think I will embroider the flowers on mine just for a little difference but we shall see what I think when I get to that point. Though, as I think about it, if I want to embroider them it would be smart to do it before I do the quilting - much easier to hide the knots!The label ended up being the scraps I had left over from the borders that I used as part of my backing. It works.Well, for better or worse, this should be in the mail later today. I just hope my swap partner likes it as well as I do!

Wednesday, September 5, 2007

OOOPS!

I got the label for the baby auction quilt finished last night and about half an hour later the owner called to see if it was done so she could stop by and pick it up! When she got here we discovered that I made a mistake on the weight; 9 oz. instead of 12! So Carol went home without her quilt and I had to pick out the 9 and get 12 in its place. It turned out very well and Carol will come by this morning to pick it up for real!

This picture shows a little serendipity. When I chose the font to use for the label (I print the info on paper and then trace it onto the fabric) I was looking for a fun font that would be easy to embroider. When I had the label ready to go on the quilt I laid it on the front and discovered that I had chosen the exact font that the preprinted blocks were done in and I had done the embroidery in green just like the blocks!

I have just a few more minutes of quilting to do on my fall swap quilt and then I can work on the embellishments and decide if they are a good idea or not!

I really need to tidy the sewing room soon because my brother and his wife are coming at the end of September for a visit and they deserve a decent guest room. I am guessing I will put some stuff in the attic to get it out of the way. I just need to bring it all back down when they are gone and get with cleaning that stuff out! Before they arrive I also need to make some decisions about what to take to the quilt retreat at the beginning of next month. Once I get the cleanup and decision making done I will chose one project to work on so I don't make a big mess again. Maybe crazy quilt blocks!

Monday, September 3, 2007

Fairly Productive Weekend

Had a great visit with our daughter, son-in-law and adorable grandson this weekend. Layden had a bit of a cold but that didn't deter him from playing with all the cool new stuff Grammy and Grandpa brought in their car! Most of the toys were for outside - his favorite place to be, especially if it involves dirt and lots of it! He even got to help Grandpa and Daddy do work with TOOLS! His favorite is the cordless screwdriver. He tends to use up most of the battery power so it is tough for Daddy to get a project done!

Meanwhile, his mom and I did some quilting. Chelsea finished a top for Project Linus and got it sandwiched, basted, quilted and even got the binding machine sewn on. She is currently working on the hand sewing. Chelsea has been very busy the last few weeks. She made 4 'quiltlets' and I got to choose my favorite that she will finish for me. She also has three cute little doll quilt tops made. Her neighbor, Gail, came over for a little quilting tutorial on Saturday also. She is doing pretty well and is very enthusiastic. I think she has her top all done and is working on the quilting already and she just started cutting on Saturday!

We also did some jam making (we got nectarines from the farmer's market) and canning (pears we bought on our way over and applesauce made from apples we brought from home).

I finished the bindings on the two baby quilts that I quilted last week so that is two more items to the finished column! Awesome! I also made this little sample 'quiltlet' when I helping Gail and Chelsea that I will either finish off as is, with some borders or enlarge into a lap quilt. This evening I will probably finish the label for the auction baby quilt and either work on my fall swap quilt or work on the design for an idea I got while at Chelsea's. Either way, I will be sitting in my recliner with my feet up. I got to drive the second leg of our trip home today across Snoqualmie Pass - about 140 miles in 4 hours! Larry did the first leg of 150 miles in about 2 hours! So not fair!

Thursday, August 30, 2007

Label time

The winner of this quilt at the auction in April called today to see about having a label put on it for her first grandchild born yesterday. She dropped by with the quilt this evening and I got started on the label. I need to have the label done and on the quilt by next Wednesday evening so she can take it down to San Francisco next Thursday when they head down to see the baby. I am probably half done with the embroidery and then I just need to get it on there.

I am pretty much ready for the trip to see my grandbaby tomorrow. Just need to start loading the van and make sure I get all the stuff in there. It is nice that I won't have to leave quilting behind this trip since I will be doing some teaching.

Wednesday, August 29, 2007

Found an extra hour

Managed to find a little extra time last night and got another baby quilt top quilted and the binding ready for hand sewing. Just one more to quilt but probably not this week. I need to get some things ready for our weekend away. I will be doing a mini quilting class for my daughter and her neighbor so I want to get some things ready like they do for the TV quilt shows. Chelsea has the piecing part figured out but now I need to show her how to machine quilt and put binding on. I think I have a small quilt I can do some demonstrating on. I will probably bring some of my scrappy squares for teaching piecing tops. Hopefully we will have some pictures to post either over the weekend or when I get home.

Monday, August 27, 2007

Not enough hours in the day

Back working with Larry today after a week off. That really cuts into my sewing time especially if I have other things I need/want to get done. As you can see I got a better picture of the group quilt yesterday on Sally's design wall. She was down in Oregon with her husband for a powered parachute fly-in and found a quilt shop that was having a sale. She got some 108" wide fabric for the back for only about $3/yard and didn't have to pay tax! I am just glad that I am done with my part of that project.

This evening I got the second baby quilt totally finished so I just have three more to go.

We are heading to our daughter's house for Labor Day and I guess I will be doing a little quilting instruction for her and her neighbor who is interested in learning. Before I go I need to go through some stuff so I can take Chelsea some fabric and projects to work on. She sent me an email the other day with the subject - Look what you've done to me... - as if it was a bad thing to like to quilt!

Friday, August 24, 2007

Sneak Peek

I have been working on my swap quilt for the Four Seasons Quilt Swap. I just haven't posted anything as a teaser. I am again making two just because I figure it is going to turn out too cool and I won't want to send it to my partner. I have both of the tops done and I am nearly done with the hand quilting on the first one. Once the quilting is done I have some thoughts about yo-yos and maybe buttons for embellishment. We shall see how that turns out.

Today I got two more baby quilts machine quilted and the bindings are ready for the hand sewing. I have two more baby quilts that need quilting and I think I will try to get them both done soon. One is the other like the one here and the other is like this one. When those are done I can take a total of 4 more off my UFO/WIP list!

My daughter Chelsea is really starting to come down with the quilting bug since she finished her first top. She made a couple of doll quilts tops in the last few days and called for quilting advice yesterday. The next call should be about binding.